OmniEMROMNI QMS: ISO9001
| Title | Description | Image | PDF Page Reference |
|---|---|---|---|
| 0.1 General |
This International Standard employs the process
approach, which incorporates the Plan-Do-Check-Act (PDCA) cycle and
risk-based thinking.
|
|
ISO9001 PDF Page #6 |
| 0.3.1 General |
The process approach involves the systematic definition and management of processes, and their interactions, so as to achieve the intended results in accordance with the quality policy and strategic direction of the organization. Management of the processes and the system as a whole can be achieved using the PDCA cycle (see 0.3.2) with an overall focus on risk-based thinking (see 0.3.3) aimed at taking advantage of opportunities and preventing undesirable results. |
|
ISO9001 PDF Page #7 |
| 0.3.2 Plan-Do-Check-Act cycle |
The PDCA cycle can be applied to all processes and to
the quality management system as a whole.
|
|
ISO9001 PDF Page #8 |
| 7.5.2 Creating and updating |
When creating and updating documented information, the
organization shall ensure appropriate:
|
|
ISO9001 PDF Page #19 |
| 8.3.6 Design and development changes |
The organization shall identify, review and control
changes made during, or subsequent to, the design and development of
products and services, to the extent necessary to ensure that there is no
adverse impact on conformity to requirements.
The organization shall retain documented information on:
|
|
ISO9001 PDF Page #22 |